Articles | Volume 386
https://doi.org/10.5194/piahs-386-277-2024
https://doi.org/10.5194/piahs-386-277-2024
Post-conference publication
 | 
04 Jul 2024
Post-conference publication |  | 04 Jul 2024

Flood risk management in planning and construction of city: the Guangzhou experience

Minyi Kuang, Yanyan Zheng, Xingdong Deng, Yukui Yang, Jingchen Wang, Xintian Sui, and Yuan Peng

Viewed

Total article views: 117 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
78 29 10 117 6 5
  • HTML: 78
  • PDF: 29
  • XML: 10
  • Total: 117
  • BibTeX: 6
  • EndNote: 5
Views and downloads (calculated since 04 Jul 2024)
Cumulative views and downloads (calculated since 04 Jul 2024)

Viewed (geographical distribution)

Total article views: 109 (including HTML, PDF, and XML) Thereof 109 with geography defined and 0 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 
Latest update: 06 Oct 2024
Download
Short summary
Urban waterlogging disasters caused by rainstorm happened more frequently. The investigation and analysis of the historical waterlogging events of Guangzhou in the past 10 years showed that, the urban waterlogging has happened more frequently in lowland, hardening underlying surface and drainage system jacked by high water level. Guangzhou has innovatively delimited high-risk regions by watershed units, using Remote Sensing (RS) data and GIS data, which become the basis of flood risk management.