the Creative Commons Attribution 4.0 License.Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method
Related authors
Cited articles
He, X., Wu, Y., and Jiang, G.: Profit allocation model of supply network
based on revised Shapely value, Soft Science, 28, 70–73, 2014.
Howson, H. R. and Sancho, N. G. F.: A new algorithm for the solution of
multi-state dynamic programming problems, Math. Program., 8, 104–106, 1975.
Li, Y., Zhou, J., Zhang, S., Huang, C., and Yan, D.: Combined dispatching
chart of cascade hydropower stations on Yalong river, Jinsha river and
Yangtze river, Journal of Hydroelectric Engineering, 35, 32–40, 2016.
Wang, Y., Guo, S., Zhou, Y., Hong, X., Hu, T., and Liu, D.: Uncertain
analysis of long-term generation optimal operation for reservoirs, Water
Resources and Power, 32, 61–65, 2014.
Xu, W.: Research on some issues in the joint optimal operation of cascaded
reservoirs between Long yang xia and Liu jia xia, Tsinghua University, 2015.