Articles | Volume 379
https://doi.org/10.5194/piahs-379-199-2018
https://doi.org/10.5194/piahs-379-199-2018
Pre-conference publication
 | 
05 Jun 2018
Pre-conference publication |  | 05 Jun 2018

Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

Jiqing Li and Xiong Yang

Viewed

Total article views: 3,508 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
2,912 539 57 3,508 71 75
  • HTML: 2,912
  • PDF: 539
  • XML: 57
  • Total: 3,508
  • BibTeX: 71
  • EndNote: 75
Views and downloads (calculated since 05 Jun 2018)
Cumulative views and downloads (calculated since 05 Jun 2018)

Viewed (geographical distribution)

Total article views: 2,506 (including HTML, PDF, and XML) Thereof 2,403 with geography defined and 103 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 14 Dec 2024