Articles | Volume 370
https://doi.org/10.5194/piahs-370-83-2015
https://doi.org/10.5194/piahs-370-83-2015
11 Jun 2015
 | 11 Jun 2015

Effectiveness of Water Infrastructure for River Flood Management: Part 2 – Flood Risk Assessment and Its Changes in Bangladesh

Y. Kwak, M. Gusyev, B. Arifuzzaman, I. Khairul, Y. Iwami, and K. Takeuchi

Viewed

Total article views: 2,092 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
1,045 941 106 2,092 138 166
  • HTML: 1,045
  • PDF: 941
  • XML: 106
  • Total: 2,092
  • BibTeX: 138
  • EndNote: 166
Views and downloads (calculated since 11 Jun 2015)
Cumulative views and downloads (calculated since 11 Jun 2015)

Cited

Latest update: 07 Sep 2025
Download
Short summary
This study consists of two parts in the issue of flood change: hazard assessment (Part 1) and risk assessment (Part 2). Part 2 focuses on estimating nationwide flood risk in terms of affected people and rice crop damage due to a 50-year flood hazard and quantifying flood risk changes. The preliminary results show that a tendency of flood risk change strongly depends on the temporal and spatial dynamics of exposure and vulnerability such as distributed population and effectiveness of water infra.
Share