Articles | Volume 379
https://doi.org/10.5194/piahs-379-119-2018
© Author(s) 2018. This work is distributed under
the Creative Commons Attribution 4.0 License.Study on reservoir time-varying design flood of inflow based on Poisson process with time-dependent parameters
Related authors
Cited articles
China Hydropower Consulting Group, Northwest Institute of survey and
design: Study on the Recent Dispatch and Utilization of
Longyangxia-Liujiaxia Reservoir, R, 2005.
Eastoe, E. F.: Modelling the distribution of the cluster maxima of
exceedances of subasymptotic thresholds, J. Biometrika, 99, 43–55, https://doi.org/10.1093/biomet/asr078, 2012.
Lang, M., Ouarda, T. B. M. J., and Bobée, B.: Towards operational guidelines for
over-threshold modelling, J. Hydrol., 255, 103–117, https://doi.org/10.1016/S0022-1694(99)00167-5, 1999.
Li, D., Guo, S. L., and Yin, J. B.: PDS/GP model with variable parameters and its
application for flood frequency analysis, J. Hydraul.
Eng., 47, 1269–1276, https://doi.org/10.13243/j.cnki.slxb.20151322, 2016.
Li, J. Q., Yao, Z. Z., Jia, H. S., and Ji, C. M.: Feasibility argumentation on the
dynamical flood control limited water level of Liujiaxia reservoir in flood
season, J. Hydraul. Eng., 5, 1–6, https://doi.org/10.3969/j.issn.1003-1243.2007.05.001, 2007.