Articles | Volume 370
https://doi.org/10.5194/piahs-370-3-2015
© Author(s) 2015. This work is distributed under
the Creative Commons Attribution 3.0 License.Estimating urban flood risk – uncertainty in design criteria
Related authors
Cited articles
Australian Rainfall and Runoff: Project 1: Development of Intensity Frequency Duration Information across Australia, available at: http://www.arr.org.au/revision-projects/project-list/project-1/, 2013.
Bureau of Meteorology: Glossary: ARI and AEP, available at: http://www.bom.gov.au/water/designRainfalls/ifd/glossary.shtml, 2013a.
Bureau of Meteorology: Frequently Asked Questions: New AR&R probability terminology, available at: http://www.bom.gov.au/water/designRainfalls/ifd/ifd-faq.shtml#sec1q6, 2013b.
Chowdhury, R. and Beecham, S.: Stormwater Drainage Design under Climate Change and Variability Conditions, in: Proceedings of the 34th World Congress of the International Association for the Hydro- Environment Research and Engineering: 33rd Hydrology and Water Resources Symposium and 10th Conference on Hydraulics in Water Engineering, edited by: Valentine, E. M., Apelt, C. J., Ball, J., Chanson, H., Cox, R., Ettema, R., Kuczera, G., Lambert, M., Melville, B. W., and Sargison, J. E., Barton, Australia, 734–741, 1492, 2011.
Green, J.: The Revised Intensity-Frequency-Duration (IFD) Design Rainfall Estimates for Australia – An Overview, in: Proceedings of the 34th Hydrology and Water Resources Symposium, 19–22 November 2012, Sydney, Australia, 2012.