Journal cover Journal topic
Proceedings of the International Association of Hydrological Sciences An open-access publication for refereed proceedings in hydrology
Journal topic

Journal metrics

CiteScore value: 0.9
CiteScore
0.9
SNIP value: 0.504
SNIP0.504
IPP value: 0.81
IPP0.81
SJR value: 0.296
SJR0.296
Scimago H <br class='widget-line-break'>index value: 11
Scimago H
index
11
h5-index value: 19
h5-index19
Volume 368
Proc. IAHS, 368, 197–203, 2015
https://doi.org/10.5194/piahs-368-197-2015
© Author(s) 2015. This work is distributed under
the Creative Commons Attribution 3.0 License.
Proc. IAHS, 368, 197–203, 2015
https://doi.org/10.5194/piahs-368-197-2015
© Author(s) 2015. This work is distributed under
the Creative Commons Attribution 3.0 License.

  06 May 2015

06 May 2015

An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment

L. Zengmei1,2, Q. Guanghua2, and C. Zishen3 L. Zengmei et al.
  • 1Department of Water Conservancy and Hydropower Engineering, South China University of Technology, Guangzhou, 510640, China
  • 2State Key Laboratory of Hydraulics & Mountain River Engineering, Sichuan University, 610065, China
  • 3Department of Water Resources & Environmental Engineering, Zhongshan University, Guangzhou, 510275, China

Keywords: Changing environment, waterlogging control benefit, waterlogging loss, estimation, mathematical expectation, copula function, joint probability density function

Abstract. The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the category, quantity and spatial distribution of the disaster-bearing bodies are also changed more or less. Therefore, under the changing environment, the direct benefit of a waterlogging control project should be the reduction of waterlogging losses compared to conditions with no control project. Moreover, the waterlogging losses with or without the project should be the mathematical expectations of the waterlogging losses when rainstorms of all frequencies meet various water levels in the drainage-accepting zone. So an estimation model of the direct benefit of waterlogging control is proposed. Firstly, on the basis of a Copula function, the joint distribution of the rainstorms and the water levels are established, so as to obtain their joint probability density function. Secondly, according to the two-dimensional joint probability density distribution, the dimensional domain of integration is determined, which is then divided into small domains so as to calculate the probability for each of the small domains and the difference between the average waterlogging loss with and without a waterlogging control project, called the regional benefit of waterlogging control project, under the condition that rainstorms in the waterlogging-prone zone meet the water level in the drainage-accepting zone. Finally, it calculates the weighted mean of the project benefit of all small domains, with probability as the weight, and gets the benefit of the waterlogging control project. Taking the estimation of benefit of a waterlogging control project in Yangshan County, Guangdong Province, as an example, the paper briefly explains the procedures in waterlogging control project benefit estimation. The results show that the waterlogging control benefit estimation model constructed is applicable to the changing conditions that occur in both the disaster-inducing environment of the waterlogging-prone zone and disaster-bearing bodies, considering all conditions when rainstorms of all frequencies meet different water levels in the drainage-accepting zone. Thus, the estimation method of waterlogging control benefit can reflect the actual situation more objectively, and offer a scientific basis for rational decision-making for waterlogging control projects.